Trace Group Hold signed a BGN 5m contract for public works. The company would have to reconstruct sections of an existing road adding up to 12km in total. The term of the contract is 255 days.
Trace Group Hold sings a BGN 5m contract for road reconstruction (NEUTRAL)
14.02.2019 Source: Trace Group Hold; FFBH